Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Alwasel, A, Abdel-Rahman, E M, Haas, C T and Lee, S (2017) Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, 143(06).

Borges, W F and Mário, P d C (2017) Five Project-Duration Control Methods in Time Units: Case Study of a Linearly Distributed Planned Value. Journal of Construction Engineering and Management, 143(06).

Chang, R, Zuo, J, Soebarto, V, Zhao, Z, Zillante, G and Gan, X (2017) Discovering the Transition Pathways toward Sustainability for Construction Enterprises: Importance-Performance Analysis. Journal of Construction Engineering and Management, 143(06).

Dinca, M S, Barbuta-Misu, N, Madaleno, M, Dinca, G and Deari, F (2017) Integrated Analysis of EU Construction Companies’ Financial Performances. Journal of Construction Engineering and Management, 143(06).

  • Type: Journal Article
  • Keywords: Integrated economic analysis; Return on assets; Return on equity; Vector autoregression; GMM; Impulse responses function;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001287
  • Abstract:
    An integrated (statistical, econometric, and economic) analysis is conducted of two relevant financial performance measures—return on assets (ROA) and return on equity (ROE)—for 958 construction companies from eight EU countries between 2004 and 2013. The methodology can be readily applied to any country, region, or even the entire global construction sector. Findings indicate that companies from Western EU countries have higher ROE compared to companies from Eastern EU countries, but the latter offered higher ROA. Inverse of short-term debt has a high explanatory capacity in the long run. Investment productivity and labor productivity are also instrumental in explaining the variance of inverse of long-term debt. These findings indicate that companies should increase their productive investments when faced with a crisis. The majority of findings are consistent with recent research. The results are important for academics, investors, and managers because knowledge about variables, factors, and mutual influences allows better forecasts and better short-term and medium-term actions and strategies.

Kwon, N, Park, M, Lee, H, Ahn, J and Kim, S (2017) Construction Noise Prediction Model Based on Case-Based Reasoning in the Preconstruction Phase. Journal of Construction Engineering and Management, 143(06).

Lee, D, Lee, S and Kim, S (2017) Composite Phase-Change Material Mold for Cost-Effective Production of Free-Form Concrete Panels. Journal of Construction Engineering and Management, 143(06).

Li, R and Roberti, R (2017) Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works. Journal of Construction Engineering and Management, 143(06).

Liu, H, Jazayeri, E and Dadi, G B (2017) Establishing the Influence of Owner Practices on Construction Safety in an Operational Excellence Model. Journal of Construction Engineering and Management, 143(06).

Liu, J, Xie, Q, Xia, B and Bridge, A J (2017) Impact of Design Risk on the Performance of Design-Build Projects. Journal of Construction Engineering and Management, 143(06).

Luo, X, Li, H, Dai, F, Cao, D, Yang, X and Guo, H (2017) Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures. Journal of Construction Engineering and Management, 143(06).

Marrana, T C, Silvestre, J D, de Brito, J and Gomes, R (2017) Lifecycle Cost Analysis of Flat Roofs of Buildings. Journal of Construction Engineering and Management, 143(06).

Mohseni, H, Setunge, S, Zhang, G and Wakefield, R (2017) Markov Process for Deterioration Modeling and Asset Management of Community Buildings. Journal of Construction Engineering and Management, 143(06).

Pereira, E, Han, S, AbouRizk, S and Hermann, U (2017) Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. Journal of Construction Engineering and Management, 143(06).

Sullivan, J, Asmar, M E, Chalhoub, J and Obeid, H (2017) Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(06).

Teo, P and Love, P E D (2017) Re-Examining the Association between Quality and Safety Performance in Construction: From Heterogeneous to Homogeneous Datasets. Journal of Construction Engineering and Management, 143(06).

Yeh, H, Hsieh, T and Chen, J (2017) Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. Journal of Construction Engineering and Management, 143(06).

Yuan, C, McClure, T, Cai, H and Dunston, P S (2017) Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(06).

Zahoor, H, Chan, A P C, Utama, W P, Gao, R and Memon, S A (2017) Determinants of Safety Climate for Building Projects: SEM-Based Cross-Validation Study. Journal of Construction Engineering and Management, 143(06).

Zhao, Z, Tang, C, Zhang, X and Skitmore, M (2017) Agglomeration and Competitive Position of Contractors in the International Construction Sector. Journal of Construction Engineering and Management, 143(06).